It doesn't look like much progress from the outside, but I've been busy:
-Roof shingles on. (I hired a contractor-- I'm no spring chicken so am happy to pay younger men to do roofing)
-Overhead monorail in place. The monorail is supported by a structure that's completely separate from the roof trusses.
-Electrical cable in the ground (50 amp service, 230 Volts, 60' run, 6/0 copper Teck. No damn aluminum cables on this project). Passed electrical inspection
-Conduit for Cat 6 communication cable in the ground.
-Natural gas line in the ground. (30k BTU, 100' run). Passed gas inspection.
Enough digging for one summer. Whew!
Olaf





